Pink Line · Elevated

JP Nagar 4th Phase Metro Station — Pink Line, Outer Ring Road

Train times

To Jayadeva Hospital1 stopchange there for Yellow Line
To Kalena Agrahara3 stops

The Pink Line elevated section is to be inaugurated on November 13, 2026 (announced; BMRCL's official notice and timetable are awaited; one report says regular passenger service starts on November 15, unconfirmed). Trains are planned every 6 minutes at peak and 10 minutes off-peak. See the Pink Line page for updates.

On the Pink Line

  1. Kalena Agrahara3 stops
  2. Hulimavu2 stops
  3. IIMB1 stop
  4. JP Nagar 4th PhaseYou are here
  5. Jayadeva HospitalChange for Yellow Line1 stop
  6. Tavarekere2 stops
Pink Line Metro Route & Opening Date →
Advertisement

Station details

JP Nagar 4th Phase is an elevated Pink Line station on the Outer Ring Road near Vega City Mall, serving JP Nagar 3rd and 4th Phase and BTM Layout. It is the fourth of six stations on the 7.5 km elevated section, set to open on November 13, 2026, and one stop from the Yellow Line change at Jayadeva Hospital. It is also planned as the terminus of the Phase 3 Orange Line, which is approved but not yet built.

Station Type
Elevated
Status
Opens Nov 13, 2026 (announced)
Future interchange
Orange Line (Phase 3, approved)
Address
Outer Ring Road, JP Nagar 4th Phase, Bengaluru, Karnataka 560078 · Open in Google Maps

Places near JP Nagar 4th Phase Metro Station

Shopping & Markets near JP Nagar 4th Phase

1
Vega City Mall

Shopping mall on Bannerghatta Road near the station.

Area guide

The station sits where the Outer Ring Road meets Bannerghatta Road and serves JP Nagar 3rd and 4th Phase and BTM Layout.

Frequently asked questions

When will JP Nagar 4th Phase metro station open?

JP Nagar 4th Phase is on the elevated section of the Namma Metro Pink Line (Kalena Agrahara to Tavarekere), whose inauguration by Prime Minister Narendra Modi was announced for November 13, 2026. CMRS safety clearance was announced on October 28, 2026. BMRCL has not yet published the timetable or confirmed when passenger service starts (one report, citing a metro official, says November 15, two days after the inauguration), so check the Pink Line page on opening day.

Is JP Nagar 4th Phase the same as the Green Line JP Nagar station?

No. The Green Line's JP Nagar station is on Kanakapura Road. JP Nagar 4th Phase is a separate Pink Line station on the Outer Ring Road near Vega City Mall, and it is planned as an interchange with the Phase 3 Orange Line.

How do I get from JP Nagar 4th Phase to Electronic City, Silk Board or Majestic by metro?

From JP Nagar 4th Phase, ride the Pink Line 1 stop to Jayadeva Hospital and change to the Yellow Line. Take the Yellow Line south for Central Silk Board and Electronic City, or north to RV Road, where you can change to the Green Line for Majestic (Nadaprabhu Kempegowda Station) and the Purple Line.

What will the metro fare from JP Nagar 4th Phase be?

BMRCL has not announced separate Pink Line fares. Namma Metro fares are distance-based (revised February 9, 2025): ₹10 up to 2 km, ₹20 for 2–4 km, ₹30 for 4–6 km, ₹40 for 6–8 km and ₹50 for 8–10 km, with a discount on smart cards and QR tickets. The whole 7.5 km elevated section therefore falls in the ₹10–₹40 range, but treat these as estimates until BMRCL publishes Pink Line fares.

Advertisement

Plan your trip