Namma Metro Yellow Line — Route, Stations, Timings & Map (2026)

The Namma Metro Yellow Line (also called Bangalore Metro Yellow Line) runs from RV Road to Bommasandra along Hosur Road, connecting the Electronic City IT hub to the metro network. First train at 6:00 AM (Tue–Sat), 5:05 AM (Mondays), 7:00 AM (Sundays); last train leaves RV Road at 11:55 PM. 16 elevated stations, 19.15 km, opened 11 August 2025. Updated 8 August 2026.

Yellow Line — Quick Answer

Yellow Line at a Glance

TerminalsRV Road ↔ Bommasandra
Number of stations16 (all elevated)
Length19.15 km
Opened11 August 2025
Colour codeYellow
InterchangeRV Road (Green Line)
Fleet size15 three-car trains procured; being delivered and commissioned progressively
Key destinationElectronic City IT hub
OperatorBMRCL (Namma Metro)
Advertisement

All 16 Yellow Line Stations (in order)

From RV Road in the north to Bommasandra in the south. Tap any station for timings, exits, facilities and nearby places.

# Station Nearby / Notes
1RV Road (Rashtreeya Vidyalaya Road)Interchange — Green Line. Northern terminus.
2RagiguddaRagigudda Anjaneya Temple
3Jayadeva HospitalSri Jayadeva Institute of Cardiovascular Sciences. Future Pink Line interchange.
4BTM LayoutBTM Layout
5Central Silk BoardCentral Silk Board Junction. Future Blue Line (airport) interchange.
6BommanahalliBommanahalli, Hosur Road
7HongasandraHongasandra, Hosur Road
8Kudlu GateKudlu Gate, Hosur Road
9SingasandraSingasandra, Hosur Road
10Hosa RoadHosa Road Junction
11Beratena AgraharaNear Electronic City
12Electronic CityElectronic City Phase 1 (Infosys, Wipro)
13Infosys Foundation Konappana AgraharaInfosys Bangalore Campus
14Huskur RoadHuskur, Electronic City Phase 2
15Biocon HebbagodiBiocon Campus, Hebbagodi
16Bommasandra (Delta Electronics)Bommasandra Industrial Area. Southern terminus.

Yellow Line Areas & Neighbourhoods Served

The Yellow Line connects south Bengaluru's residential hubs and the Electronic City IT corridor to the metro network via Hosur Road. Here are the key localities each station serves:

# Station Key Areas & Localities
1RV RoadRashtreeya Vidyalaya Road, Jayanagar 9th Block, Siddapura. ↔ Green Line
2RagiguddaRagigudda, Jayanagar 1st Block, Srinivasa Nagar
3Jayadeva HospitalSri Jayadeva Institute, BTM 1st Stage, Tavarekere. ↔ Future Pink Line
4BTM LayoutBTM Layout 1st & 2nd Stage, Madiwala, Udupi Garden area
5Central Silk BoardSilk Board Junction, HSR Layout, Koramangala (east). ↔ Future Blue Line
6BommanahalliBommanahalli, Begur Road, Arekere
7HongasandraHongasandra, Parappana Agrahara, Mangammanapalya
8Kudlu GateKudlu Gate, Singasandra North, Hosur Road
9SingasandraSingasandra, Basapura, Garvebhavi Palya
10Hosa RoadHosa Road Junction, Kasavanahalli, Haralur Road
11Beratena AgraharaBeratena Agrahara, Neeladri Nagar, Electronic City North
12Electronic CityElectronic City Phase 1, Infosys, Wipro, TCS campuses
13Infosys Foundation Konappana AgraharaInfosys Bangalore DC, Konappana Agrahara, EC Phase 1 South
14Huskur RoadHuskur, Electronic City Phase 2, Bettadasanapura
15Biocon HebbagodiBiocon Campus, Hebbagodi, Hebbagodi Industrial Area
16BommasandraBommasandra Industrial Area, Jigani Road, Anekal taluk

Localities listed are approximate walking-distance catchment areas. All 16 stations are elevated, running along or near Hosur Road.

Yellow Line Fleet & Frequency — August 2026 Update

BMRCL procured 15 three-car trains for the Yellow Line, manufactured by CRRC Nanjing Puzhen and assembled by Titagarh Rail Systems — every new train must complete 750 km of dynamic testing before entering passenger service. From a launch fleet of just three trains (a 25-minute headway in August 2025), the line has scaled up in steps: 19 minutes from September 2025, 15 minutes from 1 November, then 13, 12 and 10 minutes through the winter.

With 10 trains now in regular service, peak-hour frequency stands at about 7 minutes, with off-peak trains roughly every 10 minutes — a dramatic improvement on the launch-day wait. BMRCL is preparing to cut peak frequency further to 6 minutes as the remaining trainsets are commissioned and ridership keeps climbing.

Sources: Deccan Herald, The Hans India

Advertisement

Yellow Line Timings

Schedule at a Glance

Day First from RV Road First from Bommasandra Last from RV Road Last from Bommasandra Peak Freq.
Monday5:05 AM5:05 AM11:55 PM10:42 PM~7 min
Tuesday – Saturday6:00 AM6:00 AM11:55 PM10:42 PM~7 min
Sunday & Public Holidays7:00 AM7:00 AM11:55 PM10:42 PM~10 min

First Train at Each Station — Weekdays (Tue–Sat)

Times marked ~ are estimates based on BMRCL's official terminal departure times and typical station spacing. On Mondays, trains start earlier at 5:05 AM from both terminals — subtract approximately 55 minutes from the times below. On Sundays, add approximately 1 hour (first trains from both terminals shift to 7:00 AM).

# Station First train
→ Bommasandra
First train
→ RV Road
1RV Road (interchange)6:00 AM (origin)~6:35 AM
2Ragigudda~6:04 AM~6:31 AM
3Jayadeva Hospital (future Pink Line)~6:08 AM~6:27 AM
4BTM Layout~6:09 AM~6:26 AM
5Central Silk Board (future Blue Line)~6:10 AM~6:25 AM
6Bommanahalli~6:12 AM~6:23 AM
7Hongasandra~6:14 AM~6:21 AM
8Kudlu Gate~6:16 AM~6:19 AM
9Singasandra~6:18 AM~6:17 AM
10Hosa Road~6:19 AM~6:15 AM
11Beratena Agrahara~6:21 AM~6:14 AM
12Electronic City~6:22 AM~6:13 AM
13Infosys Foundation Konappana Agrahara~6:26 AM~6:09 AM
14Huskur Road~6:29 AM~6:06 AM
15Biocon Hebbagodi~6:32 AM~6:03 AM
16Bommasandra~6:35 AM6:00 AM (origin)

Times marked ~ are estimates based on BMRCL's official 6:00 AM terminal departure and ~35-minute end-to-end travel time. On Sundays, all first-train times shift forward by ~1 hour (terminals start at 7:00 AM). Last trains: 11:55 PM from RV Road, 10:42 PM from Bommasandra — same on weekdays and Sundays. Source: Bangalore Metro Timings page & BMRCL official schedule.

Yellow Line Journey Times from RV Road

Approximate travel times from RV Road (northern terminus) to each station on the Yellow Line. If travelling from Majestic or another Green Line station, add your Green Line travel time plus ~3 minutes for the RV Road interchange walk.

To Station From RV Road From Bommasandra
Jayadeva Hospital~8 min~27 min
BTM Layout~9 min~26 min
Central Silk Board~10 min~25 min
Kudlu Gate~16 min~19 min
Electronic City~22 min~13 min
Infosys Foundation Konappana~26 min~9 min
Biocon Hebbagodi~32 min~3 min
Bommasandra~35 min

Travel times are estimated from BMRCL's official schedule. Actual times may vary ±2–3 minutes during peak hours. Use the fare calculator for a full door-to-door journey plan including interchange connections.

Yellow Line Fares

Namma Metro fares are distance-based (₹10–₹90). The same fare slabs apply on the Yellow, Purple and Green lines. Smart card holders get a 10% discount. QR ticket fares match token prices.

Yellow Line — Key Route Fares (Token)

Route Stations Time Token Fare
RV Road → BTM Layout3~8 min₹20
RV Road → Central Silk Board4~10 min₹30
RV Road → Electronic City11~22 min₹60
RV Road → Bommasandra15~35 min₹70
Bommasandra → Electronic City4~13 min~₹30
Jayadeva Hospital → Electronic City9~14 min~₹50

Cross-Line Fares to Electronic City (Token)

From Via Time Fare
Majestic (Nadaprabhu)Green Line → RV Road~50 min₹70
IndiranagarMajestic + RV Road~60 min₹80
WhitefieldMajestic + RV Road~85 min₹90
YeshwanthpurRV Road~60 min₹80

Fares marked ~ are estimates; exact fares depend on your precise boarding and destination stations. For a precise fare, use the fare calculator. Smart card fare = token fare × 0.9.

Interchanges & Connections

To travel from a Purple or Green Line station to Electronic City, plan your route — the journey planner will route you via the RV Road interchange and show the fare and travel time.

How to Reach Electronic City by Namma Metro

Electronic City is the main reason the Yellow Line was built. Here's how to get there from anywhere on the metro network:

From Majestic / Purple Line Stations

  1. Take the Purple Line to Nadaprabhu Kempegowda (Majestic).
  2. At Majestic, follow signs to the Green Line platform (same-station interchange, no re-ticketing needed).
  3. Take the Green Line southbound towards Silk Institute and get off at RV Road (3 stops from Majestic, ~8 min).
  4. At RV Road, follow signs to the Yellow Line platform (same-station interchange).
  5. Take the Yellow Line southbound to Electronic City (11 stops, ~22 min) or your destination station.

Total: Majestic → Electronic City takes ~50 min, fare ₹70 token (₹63 smart card). One ticket covers all interchanges — no need to buy separate tickets for each line.

From Green Line Stations (Nagasandra–Silk Institute)

Board the Green Line towards Silk Institute and get off at RV Road. Change to the Yellow Line at RV Road (follow signage inside the station). Example: Yeshwanthpur → Electronic City takes ~60 min, fare ₹80.

Which Station for Which Part of Electronic City?

Your Destination Get Off At Walk / Last Mile
Infosys (EC Phase 1), Wipro, TCSElectronic City5–10 min walk or company shuttle
Infosys Bangalore DC (main campus)Infosys Foundation Konappana AgraharaAdjacent to campus gate
EC Phase 2, HCL, smaller IT parksHuskur Road5–15 min auto/walk
Biocon, Hebbagodi Industrial AreaBiocon Hebbagodi5 min walk to Biocon campus
Bommasandra Industrial Area, JiganiBommasandraAuto/bus from terminus
HSR Layout, Koramangala (east)Central Silk BoardAuto 10–15 min
BTM Layout, MadiwalaBTM Layout5–10 min walk

Yellow Line Metro vs Driving on Hosur Road

Hosur Road (NH 44) between Silk Board and Electronic City is one of India's most congested corridors. The Yellow Line runs parallel to it, offering a dramatically faster commute:

Route Metro Time Driving (Peak) Metro Fare Cab (Approx)
Silk Board → Electronic City12 min45–90 min₹40₹250–400
RV Road → Electronic City22 min60–120 min₹60₹350–550
Majestic → Electronic City50 min75–150 min₹70₹500–800
RV Road → Bommasandra35 min75–140 min₹70₹450–700

Driving times are typical weekday peak-hour estimates (8–10 AM, 5–8 PM) on Hosur Road. Cab fares are approximate and vary with surge pricing. A daily metro commuter using a smart card saves ₹8,000–12,000 per month compared to cab rides on the same route.

Peak Hours & Tips for Yellow Line Commuters

When Is the Yellow Line Most Crowded?

Commuter Tips

Yellow Line on the Metro Map

See how the Yellow Line connects with the Purple and Green lines on the full network map.

Bangalore Metro Yellow Line on the 2026 Namma Metro route map — RV Road to Bommasandra via Electronic City

Open the full Bangalore Metro map →

Yellow Line — Frequently Asked Questions

When did the Bangalore Metro Yellow Line open?

The Yellow Line opened to the public on 11 August 2025, connecting Electronic City to the metro network for the first time.

How many stations are on the Yellow Line?

There are 16 stations, all elevated, over 19.15 km from RV Road to Bommasandra. RV Road is an interchange with the Green Line.

What is the route of the Yellow Line?

It runs from RV Road to Bommasandra, largely along Hosur Road, via Jayadeva Hospital, Central Silk Board, Kudlu Gate, Electronic City and Bommasandra.

What are the Yellow Line timings?

First train at 6:00 AM (Tue–Sat), 5:05 AM (Mondays), 7:00 AM (Sundays); last train leaves RV Road at 11:55 PM. See the full timings page for every station.

How do I change to the Yellow Line?

Interchange at RV Road, which connects with the Green Line. Future interchanges are planned with the Pink Line at Jayadeva Hospital and the Blue Line at Central Silk Board.

Does the Yellow Line go to Electronic City?

Yes — the Yellow Line serves Electronic City directly, with stations at Electronic City, Infosys Foundation Konappana Agrahara and Biocon Hebbagodi. It's the fastest metro route to Bengaluru's largest IT hub.

How many trains run on the Yellow Line?

BMRCL procured 15 three-car trains for the Yellow Line, of which 10 are now in regular service. Peak-hour frequency currently stands at about 7 minutes (roughly 10 minutes off-peak), and BMRCL is preparing to cut it further to 6 minutes as the remaining trainsets are commissioned.

What time does the first metro reach Electronic City?

The first train from RV Road reaches Electronic City at approximately 6:22 AM on weekdays (Tuesday–Saturday). On Sundays and public holidays the first train starts at 7:00 AM, reaching Electronic City around 7:22 AM. From the Bommasandra end, the first train passes Electronic City at ~6:13 AM weekdays.

What are the Yellow Line Sunday metro timings?

On Sundays and public holidays, the first Yellow Line train departs from both RV Road and Bommasandra at 7:00 AM — one hour later than weekdays. The last train timing is the same as weekdays: 11:55 PM from RV Road and 10:42 PM from Bommasandra. The metro runs every day of the year without exception.

How long does the Yellow Line take from end to end?

The full trip from RV Road to Bommasandra (or reverse) takes approximately 35 minutes covering 19.15 km across 16 stations. Key segments: RV Road to Electronic City is about 22 minutes; RV Road to Central Silk Board is about 10 minutes; Electronic City to Bommasandra is about 13 minutes.

What is the Yellow Line metro fare from RV Road to Electronic City?

The token fare from RV Road to Electronic City is ₹60. Smart card holders pay ₹54 (10% discount). The full Yellow Line from RV Road to Bommasandra costs ₹70 token. Fare from Majestic (Green Line) to Electronic City is ₹70 including the RV Road interchange.

How do I get to Electronic City by metro from Majestic?

From Majestic, take the Green Line towards Silk Institute and get off at RV Road (3 stops, ~8 min). At RV Road, change to the Yellow Line towards Bommasandra and ride to Electronic City (11 stops, ~22 min). Total journey: ~50 minutes, fare ₹70. One ticket covers both lines — no re-ticketing at interchanges.

Is the Yellow Line faster than driving on Hosur Road?

Yes, significantly. During peak hours (8–10 AM, 5–8 PM), driving from Silk Board to Electronic City on Hosur Road takes 45–90 minutes. The Yellow Line covers the same stretch in 12 minutes. A daily metro commuter saves ₹8,000–12,000 per month compared to cab rides on the same route.

When are the peak hours on the Yellow Line?

The Yellow Line is busiest during 8:00–10:00 AM (towards Electronic City/Bommasandra) and 5:30–8:00 PM (towards RV Road). Off-peak hours between 10 AM and 5 PM are comfortable with seating usually available. Sundays and holidays see light ridership throughout the day.

Why the Yellow Line Matters

The Yellow Line (Reach 5 of Phase 2) is one of the most impactful additions to the Namma Metro network. In its first full year of operation, the 19.15 km corridor carried more than 3.8 crore passenger journeys — and it did so while still fleet-constrained, which makes the number all the more striking. Average daily ridership climbed from 81,365 in its opening month (August 2025) to around 1 lakh by November 2025 and roughly 1.5 lakh a day by July 2026, a near-doubling in under a year as more trains entered service and headways shrank. Here's what the line changed for Bengaluru:

Behind the passenger numbers is a decade of building. The elevated corridor along Hosur Road was approved under Phase 2 and civil work began in 2020; the viaduct was completed and the first CRRC–Titagarh trainsets arrived for trials by 2023, with RDSO and CMRS safety clearances following in 2024. The line was formally inaugurated on 11 August 2025 with all 16 stations live from day one — a rare full-corridor opening rather than a phased Reach-by-Reach launch. Its single biggest engineering constraint has never been the track but the trains: a global rolling-stock supply crunch meant the corridor opened with just three trainsets, and the steady ramp-up in frequency since then is the story of that gap slowly closing.

Construction Progress & Key Milestones

August 2026

Yellow Line completes its first year — 3.8 crore passenger journeys carried, with daily ridership up to roughly 1.5 lakh. Peak-hour frequency now about 7 minutes with 10 trains in service; BMRCL preparing to cut it further to 6 minutes.

Late 2025 – mid 2026

Fleet scaled up from 3 to 10 trains as deliveries continued; peak headway progressively cut from 25 minutes at launch to 19, 15, 13, 12, 10 and then 7 minutes. Each train requires 750 km of dynamic testing before entering passenger service.

August 2025

Yellow Line opened to passengers on 11 August 2025 — all 16 stations from RV Road to Bommasandra operational from day one.

2024

RDSO and CMRS safety clearances obtained. Track work, signalling and station finishing completed across the full 19.15 km corridor.

2023

Viaduct construction completed. First CRRC–Titagarh trains delivered and trial runs began on the elevated corridor.

2020

Civil construction commenced on the elevated section along Hosur Road from RV Road to Bommasandra.