Bangalore Metro Timings 2026 — First & Last Train, Frequency

Metro timings in Bangalore for all active Namma Metro lines — Purple, Green and Yellow — with separate timetables for weekdays, Saturdays, Sundays and public holidays. Also includes expected timings for the Pink Line opening August 2026 and the Blue Line. Based on the official BMRCL timetable. Updated July 2026.

Checking if the metro is running…
Find your nearest metro station

Your location is used only in your browser to measure distance — it is never sent to us or stored.

Bangalore Metro Timings at a Glance

Line First Train (Tue–Sat) First Train (Sun) Last Train Peak Frequency
Purple5:00 AM7:00 AM11:05 PM~8 min
Green5:00 AM7:00 AM11:05 PM~7 min
Yellow6:00 AM7:00 AM11:55 PM (from RV Road)~7 min

On Mondays the Purple & Green lines start earlier at 4:15 AM; the Yellow Line also starts early at 5:05 AM. The Yellow Line runs the network's latest service — the last train leaves RV Road at 11:55 PM.

Quick Answer

Purple Line Timings (Whitefield ↔ Challaghatta)

First and last train departures from each terminal.

Day From Whitefield
First → Last
From Challaghatta
First → Last
Peak Frequency
Monday4:15 AM → 10:45 PM4:15 AM → 11:05 PM~8 min
Tuesday–Friday5:00 AM → 10:45 PM5:00 AM → 11:02 PM~8 min
Saturday5:00 AM → 10:45 PM5:00 AM → 11:05 PM~8 min
Sunday7:00 AM → 10:45 PM7:00 AM → 11:05 PM~8 min

Green Line Timings (Madavara ↔ Silk Institute)

Day From Madavara
First → Last
From Silk Institute
First → Last
Peak Frequency
Monday4:15 AM → 10:57 PM4:15 AM → 11:05 PM~7 min
Tuesday–Friday5:00 AM → 10:57 PM5:00 AM → 11:05 PM~7 min
Saturday5:00 AM → 11:00 PM5:00 AM → 11:05 PM~8 min
Sunday7:00 AM → 11:00 PM7:00 AM → 11:05 PM~8 min
Advertisement

Yellow Line Timings (RV Road ↔ Bommasandra)

The Yellow Line serves Electronic City and runs the latest last train of the network from RV Road.

Day From RV Road
First → Last
From Bommasandra
First → Last
Peak Frequency
Monday5:05 AM → 11:55 PM5:05 AM → 10:42 PM~7 min
Tuesday–Friday6:00 AM → 11:55 PM6:00 AM → 10:42 PM~7 min
Saturday6:00 AM → 11:55 PM6:00 AM → 10:42 PM~10 min
Sunday7:00 AM → 11:55 PM7:00 AM → 10:42 PM~10 min

Pink Line Timings — Opening August 2026

The Pink Line elevated section (6 stations, Kalena Agrahara to Tavarekere) cleared RDSO speed trials on 4 June 2026 and is targeting passenger operations from August 15, 2026. BMRCL has not yet published the official timetable. Based on the patterns of existing Namma Metro lines, here is what to expect:

Day / Detail Expected First Train Expected Last Train Expected Frequency
Weekday (Mon–Sat)~5:00 AM~11:00 PM10–15 min initially
Sunday / Holiday~7:00 AM~11:00 PM15–20 min initially

Elevated section stations (Phase 1, 7.5 km):

  1. Kalena Agrahara (southern terminus)
  2. Hulimavu
  3. JP Nagar 4th Phase
  4. IIMB
  5. Jayadeva Hospital (interchange with Yellow Line)
  6. Tavarekere (end of elevated section)

These are estimates based on BMRCL's standard service patterns. Official Pink Line timings will be published by BMRCL when the line opens. Full Pink Line details →

Blue Line Timings — Coming Late 2026

The Blue Line Phase 2A (Silk Board to KR Puram, 13 stations along the Outer Ring Road) is targeting late 2026. Phase 2B (KR Puram to Kempegowda International Airport, 17 stations) follows in 2027. Official timetables have not yet been published.

Phase Route Stations Target Opening
Phase 2ASilk Board ↔ KR Puram13Late 2026
Phase 2BKR Puram ↔ Airport (KIA)172027

Key Blue Line interchanges: Yellow Line at Central Silk Board, Purple Line at Baiyyappanahalli (via KR Puram).

Service hours are expected to follow BMRCL's standard pattern (~5:00 AM–11:00 PM on weekdays) once inaugurated. Full Blue Line details →

Advertisement

Train Frequency by Time of Day

How often Namma Metro trains arrive changes through the day. Peak hours have the shortest waits; early-morning and late-night services are spaced further apart.

Time of Day Purple & Green Yellow
Early morning (before 7 AM)15–30 min15–20 min
Morning peak (8–11 AM)7–8 min~7 min
Midday off-peak (11 AM–5 PM)8–10 min10–12 min
Evening peak (5–8 PM)7–8 min~7 min
Late night (after 10 PM)10–25 min15–20 min

BMRCL operates additional trains from select intermediate stations during demand surges. Train timings may vary subject to planned activities or special events.

Catching the Last Train & Interchanges

If your journey involves an interchange, plan for the earlier of the two lines' last trains. The last service leaves the terminals, so the further you are down a line, the earlier the last usable train passes your station.

As a rule of thumb, if you need to change lines, aim to start your journey at least 60–75 minutes before the last train at your origin.

First & Last Train at Key Stations

Estimated arrival times at popular intermediate stations, based on terminal departure times and average line speed. Actual times may vary by 2–3 minutes.

Purple Line Stations (Tue–Sat)

Station First Train
(towards Challaghatta)
First Train
(towards Whitefield)
Last Train
(latest direction)
Whitefield5:00 AM (origin)~5:55 AM~11:45 PM
Baiyyappanahalli~5:20 AM~5:35 AM~11:25 PM
Indiranagar~5:22 AM~5:33 AM~11:22 PM
MG Road~5:25 AM~5:30 AM~11:20 PM
Majestic (interchange)~5:30 AM~5:25 AM~11:15 PM
Vijayanagar~5:38 AM~5:18 AM~11:08 PM
Challaghatta~5:55 AM5:00 AM (origin)11:05 PM (origin)

Green Line Stations (Tue–Sat)

Station First Train
(towards Silk Inst.)
First Train
(towards Madavara)
Last Train
(latest direction)
Madavara5:00 AM (origin)~6:00 AM~11:57 PM
Yeshwanthpur~5:12 AM~5:48 AM~11:45 PM
Mantri Square Sampige Rd~5:20 AM~5:40 AM~11:37 PM
Chickpete (Majestic adj.)~5:22 AM~5:38 AM~11:35 PM
Jayanagar~5:30 AM~5:30 AM~11:30 PM
Banashankari~5:33 AM~5:27 AM~11:27 PM
RV Road (interchange)~5:38 AM~5:22 AM~11:22 PM
Silk Institute~6:00 AM5:00 AM (origin)11:05 PM (origin)

Yellow Line Stations (Tue–Sat)

Station First Train
(towards Bommasandra)
First Train
(towards RV Road)
Last Train
(latest direction)
RV Road (interchange)6:00 AM (origin)~6:35 AM11:55 PM (origin)
Jayadeva Hospital~6:08 AM~6:27 AM~11:47 PM
Central Silk Board~6:10 AM~6:25 AM~11:45 PM
Electronic City~6:22 AM~6:13 AM~11:33 PM
Bommasandra~6:35 AM6:00 AM (origin)10:42 PM (origin)

Times marked "~" are estimates calculated from terminal departures. On Sundays, add approximately 2 hours to the first train times shown (all lines start at 7:00 AM from terminals). On Mondays, Purple & Green lines start 45 minutes earlier (4:15 AM from terminals).

Journey Time — End to End

How long a full trip takes on each Namma Metro line, terminal to terminal, without waiting time.

Line Route Stations Distance Travel Time
PurpleWhitefield ↔ Challaghatta3745.7 km~58 min
GreenMadavara ↔ Silk Institute3232.7 km~60 min
YellowRV Road ↔ Bommasandra1818.8 km~35 min

If your trip involves changing lines, add 5–8 minutes for the interchange walk and wait at Majestic (Purple ↔ Green) or RV Road (Green ↔ Yellow). Use the fare calculator to get door-to-door travel time estimates.

Sunday Metro Timings in Bangalore

On Sundays, Bangalore Metro (Namma Metro) starts later than on weekdays — all three operating lines run their first train at 7:00 AM. Last train times are the same as weekdays. There is no separate Sunday last train; the service runs until 11:05 PM on Purple and Green, and 11:55 PM from RV Road on the Yellow Line.

Line Sunday First Train Sunday Last Train Sunday Frequency
Purple Line
Whitefield ↔ Challaghatta
7:00 AM11:05 PM~10 min
Green Line
Madavara ↔ Silk Institute
7:00 AM11:05 PM~10 min
Yellow Line
RV Road ↔ Bommasandra
7:00 AM11:55 PM (RV Road)
10:42 PM (Bommasandra)
~12 min

Public holidays in Bangalore follow the same Sunday timetable. Exceptions (IPL matches, New Year's Eve) are announced by BMRCL on their official website.

Holiday & Special Day Timings

Namma Metro runs every single day of the year — there is no day off. On public holidays and national holidays (Republic Day, Independence Day, Ganesh Chaturthi, Deepavali, etc.), the metro follows the Sunday timetable:

Exceptions: BMRCL may extend operating hours for major events (New Year's Eve, IPL matches at M. Chinnaswamy Stadium, election days). Extended timings are announced 1–2 days in advance on BMRCL's official website and their social media.

Frequently Asked Questions

What time does Bangalore Metro start in the morning?

On Tuesday to Saturday, the first train is at 5:00 AM on the Purple and Green lines, and 6:00 AM on the Yellow Line. On Mondays all three lines start earlier: Purple and Green at 4:15 AM, Yellow Line at 5:05 AM. On Sundays, the first train on all lines is at 7:00 AM.

What time is the last metro in Bangalore?

The last train leaves the terminals between 10:45 PM and 11:05 PM on the Purple and Green lines. On the Yellow Line, the last train departs RV Road at 11:55 PM and Bommasandra at 10:42 PM.

What are Bangalore Metro timings on Sunday?

On Sundays, Namma Metro starts later than on weekdays — the first train on all three lines is at 7:00 AM. Last trains run until about 11:05 PM on the Purple and Green lines and 11:55 PM from RV Road on the Yellow Line.

How frequent are Bangalore Metro trains?

During peak hours trains run every 7–8 minutes. Off-peak and early morning, frequency drops to every 10–30 minutes depending on the line and time of day.

Does Bangalore Metro run on public holidays?

Yes, the metro runs every day including public holidays, usually following the Sunday timetable with a 7:00 AM first train. Check BMRCL announcements for special-event changes.

What are the Bangalore Metro timings today?

Today's timings depend on the day of the week. Tuesday to Saturday, the first train is at 5:00 AM (Purple and Green) or 6:00 AM (Yellow). On Mondays all lines start earlier — Purple and Green at 4:15 AM, Yellow at 5:05 AM. On Sundays, all lines start at 7:00 AM. Last trains run until about 11:05 PM (Purple and Green) and 11:55 PM from RV Road (Yellow). The live status box at the top of this page shows whether the metro is currently running.

How late does the Bangalore Metro run at night?

The Purple and Green lines run until around 11:05 PM from the terminals. The Yellow Line runs the latest — the last train departs RV Road at 11:55 PM. If you are catching a late train, remember that the further your station is from the terminal, the earlier the last train will reach you.

What is the first metro from Majestic (Nadaprabhu Kempegowda)?

Majestic is served by both the Purple and Green lines. The first trains pass through Majestic shortly after the 5:00 AM terminal departures on weekdays (around 5:20–5:40 AM depending on direction), and after 7:00 AM on Sundays. Exact times vary by direction — check the BMRCL timetable for your platform.

What are Bangalore Metro peak hours?

Peak hours are roughly 8:00–11:00 AM and 5:00–8:00 PM on weekdays, when trains run every 7–8 minutes and are most crowded. Travelling outside these windows means shorter queues but slightly longer waits between trains.

Is there a women's reserved coach, and what about luggage?

Yes — the first coach of every train is reserved for women at all times. Passengers may carry a reasonable amount of personal luggage; large or restricted items are subject to security screening at the station entrance. These rules apply across all operating hours.

How long does the full metro journey take end to end?

The Purple Line (Whitefield to Challaghatta, 37 stations) takes about 58 minutes. The Green Line (Madavara to Silk Institute, 32 stations) takes about 60 minutes. The Yellow Line (RV Road to Bommasandra, 18 stations) takes about 35 minutes. If you need to change lines, add 5–8 minutes for the interchange walk and wait.

What time does the first metro reach Indiranagar or Electronic City?

Indiranagar (Purple Line) gets its first train at approximately 5:22 AM on weekdays (from the Whitefield side) and 5:33 AM from the Challaghatta side. Electronic City (Yellow Line) gets its first train at approximately 6:22 AM from RV Road and 6:13 AM from Bommasandra. On Sundays, add about 2 hours (all lines start at 7:00 AM from terminals).

What will the Pink Line metro timings be when it opens?

BMRCL has not published the official timetable yet. When the Pink Line elevated section (Kalena Agrahara to Tavarekere, August 2026) opens, it is expected to operate on a similar pattern to existing lines — approximately 5:00 AM to 11:00 PM on weekdays and 7:00 AM start on Sundays. Initial service frequency is likely 10–15 minutes, improving as ridership grows. We will update this page with official timings as soon as BMRCL announces them. See the Pink Line page for the full station list and opening timeline.

When will the Blue Line Airport Metro start and what are expected timings?

The Blue Line Phase 2A (Silk Board to KR Puram, 13 stations on the Outer Ring Road) is targeting late 2026. Phase 2B to Kempegowda International Airport follows in 2027. Based on BMRCL's standard patterns, Blue Line service is expected to run from approximately 5:00 AM to 11:00 PM on weekdays. Official timetables will be published by BMRCL closer to the opening date. See the Blue Line (Airport Metro) page for the full route details.

What are the metro timings in Bangalore on the 4th Saturday?

Namma Metro in Bangalore runs on all Saturdays, including the 4th Saturday of the month. Historically BMRCL occasionally announced maintenance shutdowns on specific Saturdays, but regular service now operates on all Saturdays with the same timetable as Tuesday–Friday (first train 5:00 AM on Purple and Green, 6:00 AM on Yellow; last train up to 11:55 PM). Always check the BMRCL website for any announced maintenance closures.

Do metro timings in Bangalore change on Monday?

Yes — Mondays have a special early start on all Namma Metro lines. The Purple and Green lines start at 4:15 AM (45 minutes earlier than Tuesday–Saturday). The Yellow Line starts at 5:05 AM (55 minutes earlier than its usual 6:00 AM). Last train times on Mondays are the same as any other weekday.

Timings sourced from the official BMRCL timetable. This is an independent resource and is not affiliated with BMRCL. Always confirm timings on the official BMRCL website before travelling.

Advertisement